Set of intersection bridges

CSCEC – Life Key Bridge

CSCEC – Key Life Bridge & Gallery Garden Shade.
Project Location: New Administrative Capital City, Egypt
Year: 2021
Client: Energya steel industries Co.
ASPEN Role: Steel structure design review, verification.

Sheraton Heliopolis U-Turn bridge – Steel works

Assembly for curved steel bay No. 2 (42 m length – 254 t weight) Supply, fabricate, and installation for particular steel works for steel bay No. 1.
Project Location: Nasr city, Cairo, Egypt
Year: 2021
Client: Madar for Engineering Projects Co.
ASPEN Role: Steel structure supply, fabrication, and installation.

Makram Ebid bridge – Steel works

Assembly for curved steel bay No. 2 (42 m length – 254 t weight) Supply, fabricate, and installation for particular steel works for steel bay No. 1.
Project Location: Nasr city, Cairo, Egypt
Year: 2021
Client: Madar for Engineering Projects Co.
ASPEN Role: Steel structure supply, fabrication, and installation.

Southern region - KSA

Construction of 12 valley, and intersection post-tensioned (PT) concrete bridges.
Project Location: Southern region – KSA
Year: 2012 – 2014
Client: Saudi authorities
ASPEN Role: Design, Coordination, and WSD

Road bridges

Infrastructure is the cornerstone of a country’s social and economic development. We are proud of our contribution to infrastructure development in Egypt, which includes many of the country’s most important bridges and tunnels.
Project Location:
Year:
Client:
ASPEN Role: